Petroleum Science >2025, Issue3: - DOI: https://doi.org/10.1016/j.petsci.2025.01.003
Coupling analysis of transient cuttings transport and tubular mechanical behaviors in extended-reach drilling Open Access
文章信息
作者:Jun Zhao, Wen-Jun Huang, De-Li Gao, Wen-Long Li
作者单位:
投稿时间:
引用方式:Jun Zhao, Wen-Jun Huang, De-Li Gao, Wen-Long Li, Coupling analysis of transient cuttings transport and tubular mechanical behaviors in extended-reach drilling, Petroleum Science, Volume 22, Issue 3, 2025, Pages 1252-1269, https://doi.org/10.1016/j.petsci.2025.01.003.
文章摘要
Abstract: It is generally believed that cuttings have a significant impact on the forces of tubular string in extended-reach drilling. However, there are few studies attempted to investigate and quantify it. In this paper, a three-layer transient model for cuttings transport is established to simulate the characteristics of dynamic cuttings transport over time under various conditions. The simulation results indicate that the change in drilling parameters like ROP (rate of penetration) and flow rate of drilling fluid will lead to the non-uniform distribution of cuttings bed. And the alternation of drilling and circulation will lead to a clear wavy distribution of cuttings bed in the wellbore. Then, the effect of cuttings on tubular string is obtained through a large number of numerical simulations and the nonlinear regression method, and this influence is introduced into the conventional stiff rod model of tubular string. Finally, the transient model for cuttings transport is coupled with the modified tubular mechanic model and applies to a case study of extended-reach drilling. The results show that there is a delay effect for the effect of the changes in drilling parameters on the ground torques because the changes in drilling parameters occur instantaneously, while the changes in cuttings bed distribution are slow due to its low transport velocity. Based on the coupling analysis of transient cuttings transport and tubular mechanical behaviors, the drilling parameters are optimized, including the recommended adjustment period and adjustment range for the ROP, the proper drilling time for the increased flow rate. Furthermore, the circulation and back reaming are optimized. For circulation, the keys are choosing appropriate time interval between the two adjacent circulations and the time for each circulation. To avoid pipe stuck, at least 20 min of circulation is required to remove the cuttings bed near the large-sized BHA ((Bottom Hole Assembly)) before back reaming, and the maximum back reaming velocity should be smaller than the minimum transport velocity of the uniform bed.
关键词
-
Keywords: Extended-reach drilling; Hole cleaning; Transient cuttings transport; Theoretical modeling; Drilling optimization