文章检索
首页» 过刊浏览» 2017» Vol. 2» Issue (1) 115-122     DOI : 10.3969/j.issn.2096-1693.2017.01.011
最新目录| | 过刊浏览| 高级检索
耦合水力约束的成品油管道调度模型研究
段志刚,梁永图,张浩然,颜筱函,廖绮
中国石油大学(北京)城市油气输配技术北京市重点实验室, 北京 102249
A multi-product pipeline scheduling model coupled with hydraulic constraints
DUAN Zhigang, LIANG Yongtu, ZHANG Haoran, YAN Xiaohan, LIAO Qi
Beijing Key Laboratory of Urban oil and Gas Distribution Technology ,China University of Petroleum-Beijing, Beijing, 102249, China

全文:   HTML (1 KB) 
文章导读  
摘要  成品油管道系统能否经济、高效地运行,关键在于运营单位编制与执行调度计划的水平。由于成品油管道是一个复杂的密闭水力系统,仅约束流量难以保证管道总体运行达到最优。当前,国内外学者针对成品油管道调度优化问题展开大量的研究,但少有研究将水力约束耦合在内。本文以调度周期内体积总偏差最小为目标函数,综合考虑了注入、分输、泵站、批次运移、水力等约束,建立了连续时间的混合整数非线性规划(MINLP)模型,并将其分解成整数规划(IP)问题及混合整数线性规划(MILP)问题求解。而后,利用提出的优化模型求解出某条成品油管道的具体优化调度方案和启泵方案。调度周期为179.7 h,计算时间180.32 s。调度计划满足现场需求,结果表明模型实用、高效。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
关键词 : 成品油管道, 水力耦合, 调度优化, 混合整数非线性规划, 启泵方案
Abstract

  The economic and efficient operation of multi-product pipelines is crucially determined by preparing and implementing scheduling plans in operating units. Considering the multi-product pipeline is a complicated closed hydraulic system, the flowrate constraints alone cannot guarantee the optimization for overall pipeline operation. At present, domestic and foreign scholars are undertaking a lot of research into scheduling optimization for multi-product pipelines while mostly neglecting hydraulic constraints. In this paper, an objective function is established to minimize the total volume deviation in scheduling periods, comprehensively considering the injection, delivery, pump stations, batch migration and hydraulic constraints. A continuous-time mixed integer nonlinear programming (MINLP) model is put forward and solved by decomposing the model into integer programming (IP) and mixed integer linear programming (MILP) issues. Moreover, the proposed optimization model is put into practice for a real-world multi-product pipeline and works out the detailed optimal scheduling plan and pumping plan accordingly. Results show that the scheduling period is 179.7 hours and the calculation time is 180.32 seconds. The scheduling plan can be compliant with field requirements, which indicates the efficiency and reliability of the model.

Key words: multi-product pipeline hydraulic coupling scheduling optimization MINLP pumping plan
收稿日期: 2016-12-12     
PACS:    
基金资助:国家自然科学基金(No.51474228)资助
通讯作者: 梁永图 2016-12-12
引用本文:   
段志刚,梁永图,张浩然,颜筱函,廖绮. 耦合水力约束的成品油管道调度模型研究[J]. 石油科学通报, 2017, 2(1): 115-122. DUAN Zhigang, LIANG Yongtu, ZHANG Haoran, YAN Xiaohan, LIAO Qi. A multi-product pipeline scheduling model coupled with hydraulic constraints. Petroleum Science Bulletin, 2017, 2(1): 115-122.
链接本文:  
版权所有 2016 《石油科学通报》杂志社